Who should sealcoat before striping
Sealcoating suits asphalt lots that are sound but faded: gray surface, small cracks, loose fines at the edges. It is common at retail centers, office parks, churches and apartment communities before a full restripe. It is not a fix for potholes, deep cracks or soft spots. Those need repair or repaving first.
Concrete lots don't get sealcoat. If your lot is concrete, skip to parking lot restriping.
What sealcoat does and doesn't do
Sealcoat is a thin coat on top of the asphalt. It slows the surface from drying out and graying, gives the striping a dark background and makes the lot look cared for. It does not add strength. A lot that is breaking up, holding water or sinking under truck traffic needs repair or an overlay before any sealer goes down. A good contractor tells you that on the visit instead of sealing over the problem.
Signs it's time
- The asphalt has turned from black to light gray.
- Small cracks are spreading across the drive lanes.
- Loose stone is showing at the surface.
- New striping paint looks patchy against the old pavement.
Angi's paving guide says asphalt lots should be sealcoated every two to five years.
Coal tar or asphalt-based sealer
Ask which product the contractor uses. The USGS page on coal-tar-based sealcoat reports that coal-tar-based sealcoat contains far more PAHs (a group of chemical compounds) than asphalt-based products, roughly 1,000 times more. The same page notes that Austin banned coal-tar sealcoat in 2006. Many contractors now use asphalt-emulsion products. It's a fair question to ask.
How sealcoat and striping fit together
- Repair. Cracks get filled and bad spots patched, as sealcoat makers recommend.
- Clean. The lot is blown off or swept so the sealer bonds.
- Seal. Two coats go down, with a third in heavy-traffic spots such as entrances and drive lanes, per SealMaster's guidance.
- Cure. SealMaster asks for 24 hours after the final coat before traffic. A maintenance guide suggests 24 to 48 hours on a commercial lot, and 48 to 72 in cool, humid or shaded conditions.
- Stripe. The lines, accessible stalls and fire lanes go back on the dry, clean surface.
Weather matters. SealMaster calls for 50 degrees and rising for 24 hours, with no rain expected in that window. Ideal drying is above 70 degrees with sun and low humidity.
Planning around a busy lot
A sealcoat closes pavement for at least a day, longer than striping alone. Most sites split the lot into halves or sections so cars always have somewhere to go. Apartment communities and HOAs send notices so residents move their cars. Retail centers often pick a slow weekday or start after closing. Watch the forecast too: SealMaster says not to apply sealer if rain is expected within 24 hours. Put your busy days and any no-work dates in your request so the pro can plan the sections.
Reported sealcoating prices
| Item | Reported range |
|---|---|
| Sealcoating | $0.14 to $0.25 per square foot (Angi paving guide) |
| Sealcoating | $0.15 to $0.25 per square foot (HomeAdvisor) |
| Whole-lot sealcoating | $2,000 to $8,000 or more (HomeAdvisor) |
| Restriping after the seal | $500 to $1,200, 50 to 500 stalls (Angi paving guide) |
These are national figures. A local contractor prices your lot after measuring it and checking the cracks. More on parking lot striping cost.
Questions to ask
- Is the sealer coal-tar or asphalt-based?
- How many coats, and where will you add a third?
- Is crack filling in the price?
- How long will the lot be closed, and can you do it in halves?
- Who restripes after, and when?
Don't forget the accessible stalls on the restripe. See ADA parking compliance.
Areas we cover for parking lot sealcoating
Irving Garland Mesquite Carrollton Richardson Plano Grand Prairie Arlington Farmers Branch Addison Lewisville Rowlett DeSoto Duncanville Cedar Hill Lancaster Coppell Grapevine Balch Springs University Park
Striping FAQ
How soon after sealcoating can the lot be striped?
A maintenance guide says to restripe after the final coat has cured at least 24 hours and the surface is clean and dry. In cool or humid weather, plan on longer.
Does sealcoating fix cracks?
No. Cracks are filled before the sealer goes on. Sealcoat protects the surface but doesn't bridge open cracks or fix soft spots.
Can sealcoating and striping happen the same week?
Yes, that is the usual plan. The sealer goes down, cures for a day or two, then the striping crew comes in. Ask for one schedule that covers both.
How often should a parking lot be sealcoated?
Angi's paving guide says every two to five years. Lots with heavy truck traffic or full sun all day may need it at the shorter end.